EXPERIENCE:
|
Period:
|
Employer:
|
Type of operations:
|
November 2006
|
Acergy Norway AS
|
Offshore Manager.
MSV Viking Poseidon
Kristin: Scale Squeeze HP cap removal / installation at Template N,
S & P + varios RFO work
Heidrun: Securing of bolt at DSL -1
Demobilization of Viking Poseidon and the Acergy-Subsea7-Joint-Venture
project, after approx 7 years contract work for Statoil.
|
August - October 2006
|
Acergy Norway AS
|
Shift Supervisor, remote intervention.
MSV Viking Poseidon.
Nemo clamp installation at Åsgard H-102
Valve ops & leak detection at Visund manifold North and wellheads B1
& B2
Hydratight clamp installation at Åsgard N-102
Flushing ops at Åsgard ERB
Actuator replacement at Kristin SSIV N-101 & P-101
HIPPS Control module replacement - Kristin Template S
Control module replacement - Kristin Template S
|
August 2006
|
Acergy Norway AS
|
Offshore Manager.
MSV Viking Poseidon
Scale treatment at Norne Template D
Shifting of Fibre optic cable anchor
Choke bridge replacement - Norne Template D
Control Module replacement - Norne Template D
Flow Control Module replacement - Åsgard Template X
HP water jet cleaning of crack area - Norne FPSO
Flow Control Module replacement - Heidrun Template F
Control Module replacement - Heidrun Template E
|
April - August 2006
|
Acergy Norway AS
|
Shift Supervisor, remote intervention.
MSV Viking Poseidon.
BMA Scale treatment at Tordis Template J
GAC module replacement at Snorre UPA
4 weeks on maternity leave in June-July
|
March - April 2006
|
Acergy Norway AS
|
Offshore Manager.
MSV Viking Poseidon
Flow Control Module replacement at Heidrun Templete D and F.
BMA Scale treatment at Tordis Template J
|
Febr. - March 2006
|
Acergy Norway AS
|
Shift Supervisor, remote intervention.
MSV Viking Poseidon.
Control Modules and Flow Control Modules replacement at Sleipner East
& West Alpha North.
Choke bridges, Control Modules & CCU Actuator replacement at Statfjord
Templates F,G,L
Choke bridge replacement at Norne Template D
|
Jan. - February 2006
|
Stolt Offshore AS
|
Shift Supervisor, remote intervention.
MSV Viking Poseidon.
Scale treatment at Norne D-1CH &E-1CH
|
July - December 2005
|
Stolt Offshore AS
|
Shift Supervisor, remote intervention.
MSV Viking Poseidon
Dredging at Kristin umbilical P-102, P-201, R-103, R-201
Pigging at Kristin S-101 & S-102 - GRP cover installation at Kvitebjørn
Scale treatment at Tordis J-4H and Statfjord F-1H
Pig receiver installation using Ve-Mec connection tool at Kristin Template
K
Control Module replacements at Heidrun E-1H & B-1H
Valve ops at Norne NSAT tee B
External tree HP cap installation at Norne Template E
Choke bridge replacement at Norne Template D
Scale treatment at Norne E-3H & Heidrun D-1H
Fault finding at Q-201 & Q-202 Åsgard
Scale treatment at Norne D-1CH
|
July 2005
|
Stolt Offshore AS
|
Air Diving Supervisor / Shift Supervisor
MSV Far Saga.
Clamp installation at Oseberg Field Centre using Jacob III (air diving)
Control Module replacement at Snorre UPA using FMC ROMV system. (remote
intervention)
|
January - June 2005
|
Stolt Offshore AS
|
Shift Supervisor, remote intervention.
MSV Viking Poseidon.
Kristin Template R: GRP cover installation, Tie-in of Umbilical R-103/201,
Spool's R-101 and R-102 using Kvaerner Tie-in tool.
Åsgard Q: Shifting of Q-202 umbilical. Pigging of AS-02 and F-101 line
/ Template F. Flapper valveoperations at Åsgard ERB.
Tordis: Changeout of 6" umbilicals between the manifold and satellites
I-2H, I-4H and I-5H.
|
Aug. - Dec. 2004
|
Stolt Offshore AS
|
Shift Supervisor, remote intervention.
MSV Viking Poseidon. Control module, Choke bridge & Flow control
module changeout at Åsgard and Norne. 20" plug installation
at Åsgard A. "Fishing operations" inside 8" pipe
at Template C at Norne. Jumper deployment frame recovery at Snorre B.
Dewatering of Q-102 line at Åsgard. Dredging & umbilical exposure
at Tordis.
|
July - Aug. 2004
|
Stolt Offshore AS
|
Shift Supervisor, remote intervention.
MSV Viking Poseidon. Disconnection & recovery of old Drill Cuttings
Disposal Hose and connection of new hose at Heidrun TLP. DMA recovery
at Kristin. SCM charging for Y-10-1 and Y-10-2 ratchet tools at Midgard.
10" Plug installation at Åsgard A. RFO & pigging operations
at Statfjord. Control Module changeout at Sygin. Stopping gas-leak at
the Jotun manifold. Changeout of 6" ball valve insert at Sleipner
East. Hooning operations at Tor 2-Y. Control module changeout at Rimfaks.
|
June 2004
|
Stolt Offshore AS
|
Air Diving Supervisor.
MSV Seaway Petrel / Jacob III. Cassion clamp installation at Kvitebjørn.
|
Jan. - June 2004
|
Stolt Offshore AS
|
Shift Supervisor, remote intervention.
MSV Viking Poseidon. Temporary repairs of Cassion clamps at Kvitebjørn.
Control module & Choke bridge changeout at Midgard and Norne. Dredging
operations and concrete mattress installation at Sleipner A. Control
module changeout at Tordis. Transponder changeout at Heidrun and Åsgard.
|
Oct. - Dec. 2003
|
Stolt Offshore AS
|
Shift Supervisor, remote intervention.
MSV Viking Poseidon. Choke bridge & Control module changeout at
Norne and Åsgard. Nemo clamp installation at Åsgard. Cameron
Connector tool operations at Gulfaks C. Flow control modules changeout
at Mikkel. Temporary repairs of Cassion clamps at Kvitebjørn.
|
June - Sept. 2003
|
Stolt Offshore AS
|
Shift Supervisor, remote
intervention.
Seaway Explorer: 2" spools- and insulation covers-installations at 1350
m dept. Girassol field - Angola. Client: Total Fina Elf
MSV Viking Poseidon:
Inspection & construction work at Åsgard Gulfaks and Mikkel. Client:
Statoil
|
Nov. 2002 - June 2003
|
Stolt Offshore AS
|
Shift Supervisor, remote
intervention.
MSV Far Saga. Change out of various sub sea modules, survey, and debris
clearance at Tune, Troll, and Oseberg. ROMV operations at Snorre UPA.
Client: Hydro
|
Sept. 2000 - Nov. 2002
|
Stolt Offshore AS
|
Shift Supervisor, remote
intervention.
MSV Viking Poseidon. Åsgard RFO / Repair project. Change out of various
Control modules, Coke bridges, Flow Control modules at Åsgard, Norne,
Heidrun, Gulfaks, and Statfjord field. Valve operations. Jumper cable
installations. Pipe and umbilical shiftings. Remote pipe cutting. Variuos
plug sintallations. Survey and inspecrion. Well cemical cleaning utilizing
5" riser. Client: Statoil
|
Oct. - Nov. 2001
|
Stolt Offshore AS
|
Shift Supervisor, remote
intervention.
MSV Seaway Explorer. Girassol Installation Project in Angola. Vertical
Tie-ins of spool pieces utilizing MATIS at 1350m dept. (On leave from
Viking Poseidon) Client: Total Fina Elf
|
September 2000
|
Maritime Industry Service AS
|
Welding Inspector (EWIS)
/ Consultant.
Making documentation of material & weld traceability for two welding
/ construction projects at Deepsea Trym. Client: Odfjeld Drilling
|
June - Aug. 2000
|
Stolt Offshore AS
|
Diver / Medic.
MSV Geobay. Installation of 30" subsea plug, on a pontoon at Åsgard
B.
Shift Supervisor, remote Intervention.
MSV Normand Tonjer. Åsgard RFO project. ( torque tool, valves & jumper
cable operations at Åsgard ERB. )
Diver / Medic.
MSV Geofjord. Installation of a 30" dump line at Snorre TLP.
|
May - June 2000
|
Proff Dykk AS
|
Diver.
Installation of tree spudt-cans on Mærsk Gallant, in Ølensvåg.
|
April - May 2000
|
Proff Dykk AS &
Dacon Marine Operations AS
|
MSV Geofjord. Remote intervention. Salvaged 230 tons
of 250 tons aluminium from a wreck outside Egersund, using spesial buildt
remote operated crane and a Sea Oul ROV.
|
March 2000
|
Stolt Offshore AS
|
Deck foreman.
MSV Subsea Viking. Salvage attempt of the wreck Sleipner, outside the
lighthouse Ryvarden in Hordaland
|
Jan. - March 2000
|
Stolt Offshore AS
|
Shift Supervisor.
MSV Viking Poseidon. Remote intervention at the Åsgard field. KOS Module
handling, torque tool operations at the Åsgard RFO project.
|
December 2000
|
Stolt Offshore AS
|
Diver / Medic
MS Geofjord. Riser installation at Heidrun.
|
Sept. - Nov. 1999
|
Industri Dykk AS
|
Diving Supervisor.
Layout of high tension power cable, between mainland and the island
of Kvitsøy in Rogaland.
Project Leader.
Activity planning for future project, involving wetwelding of 900 anodes
on a platform.
|
July - Sept. 1999
|
Stolt Comex Seaway LTD.
|
Jotun FPSO anchor and installation project.
Inshore:
Building a diving station inside the turret. Some purchasing, Co-ordinating
and safety work.
Offshore:
Diver. Monitoring the anchor pull-inn process, inspection & video-surveys
and burning of access-chain in with oxy-arc. Wire-rigging
|
June 1999
|
Neergard AS
|
Diving Supervisor.
MS Pingvin. Mobilisation of diving system with DDC, for Inspection programme
at Statpipe shore approach Kalstø.
|
March 98 - May 99
|
Maritime Industry Service AS
|
Project co-ordinator.
* Schlumberger - Ocean Alliance project
* Hydralift / DSND - H.V.D.S. 160 T - BOTNICA project. * Statoil - Sleipner
, spool pieses project
* Cost calculations for Statoil and Mærsk projects - Purchasing, - estimating,
- project directing / management, - personal control, - documentation,
- quality control.
|
Jan. - Feb. 1998
|
Can A/S
|
Operator, rope-access.
Disassembling the Bideford Dolphin Derrick, using rope-access technique.
Burning / welding / rigging
|
June - Des. 1997
|
Stolt Comex Seaway A/S
|
Deck-foreman / rigger.
MSV Seaway Condor. Lay spread and trenching of 2 umbilical`s,( 16 km.
x 2 ) using carousel and stinger, at the Britannia field. Tool handling,
( ABB ) at the Troll field. Tool and jumper handling, using MHS derrick
( Hydralift ), carousel and stinger. ( Mc. Dermoth / Sub Sea ) at BP
Foinaven field. ROV`s : SCS Triton, SCS Seahawk, Sub Sea Examinator.
|
September 1997
|
Pro Dykk A/S ( on leave from SCS )
|
Supervisor / airdiver.
Maritime GMC harbour. Rigging, assembling and wet welding of 200 anodes
( 70 kg each )
|
June 1997
|
Stolt Comex Seaway A/S
|
Deck foreman.
MS Far Fosna, Draugen. Deployment / recovery of control - umbilical
for Kongsberg Offshore - control unit. ROV : SCS Seahawk
|
May 1997
|
Rockwater A/S
|
Air diver.
MSV Regalia. Installation of 42 " riser at Draupner 6/11. Clamp assembling,
hydra tightening.
|
April -May 1997
|
Stolt Comex Seaway A/S
|
Supervisor / airdiver.
MS Flekkerøy, Statpipe shore approach Kalstø, Inspection programme,
photo, video, measure of reaction forces, wet welding.
|
Dec. 96 - April 1997
|
Pro Dykk A/S
|
Supervisor / airdiver.
Inspection of ships, rigging of diving equipment, salvage of a barge
in Hinnavågen, burning with oxy-arc at NE - Frigg at Tau, and installation
of new mooring system in Lundsvågen harbour.
|
December 1996
|
EB Marine A/S
|
Welder
New-installation of PE cooling-water system for a new ship
|
December 1996
|
Tecno Dive A/S
|
Air diver.
Cleaning and inspection of Byword Dolphin, Hinnavågen.
|
Oct. - Nov. 1996
|
Pro Dykk A/S
|
Supervisor / airdiver.
Photo / video inspection at different harbours for Statens Veivesen.
Anchor work at NE - Frigg at Tau.
|
September 1996
|
Rockwater A/S
|
Saturation-diver.
DSV Bar Protector, Clayd field contract, ( Dutch sector ) Installation
of protection-frames, grout-bagging, grease-bands and air-lifting. 12
days in saturation, at 24 msv.
|
Aug. - Sept. 1996
|
Pro Dykk A/S
|
Supervisor / airdiver.
De-rigging of the NE -Frigg at Tau. Repair of pipeline at Figgjo. Inspection,
maintenance work at ships and docks in Stavanger
|
July 1996
|
Stolt Comex Seaway A/S
|
Air diver.
DSV Seaway Pelican, maintenance work at the Oseberg field
|
June - July 1996
|
Stolt Comex Seaway A/S
|
Air diver.
DSV Seaway Pelican, Removed North-East Frigg at the Frigg-field. De-rigging
of the NE - Frigg at Tau
|
May - June 1996
|
Rockwater A/S
|
Saturation-diver.
DSV Bar Protector, bell handling, rigging for divers in saturation at
Ekkofisk.
|
April - May 1996
|
Stolt Comex Seaway A/S
|
Supervisor / airdiver.
Statpipe shore approach, Kalstø. Photo / video / visual - inspection,
core-sampling concrete, shuttering work, concrete casting, burning and
welding.
|
March 1996
|
Stolt Comex Seaway A/S
|
Rigger.
Welding of 12 km. flexi pipeline at Mekjarvik
|
March. 1996
|
Offshore Marine A/S
|
Project-engineer.
Cost-calculations of decompression chamber
|
Jan. - March. 1996
|
Pro dykk A/S
|
Supervisor / airdiver.
Removing "boat bumpers", rope, wire etc. from propellers, and inspection
of different ships in the Stavanger area.
|
Nov.1995 - Feb 1996
|
Self employed
|
Building house for me, and my family.
|
Oct. - Dec. 1995
|
Pro dykk A/S
|
Supervisor / airdiver.
Preparations for demolition. Drilling in rock, Video / visual inspection
of demolition area, at "Klasaskjæret"
|
September 1995
|
Dykkefirma Jan Egild Pettersen
|
Ass. Supervisor / airdiver.
Lomsesanden - Farsund. Installation of
2 x Ø 120 cm sewage pipe-line, ( 150 m long ) LP- water-jetting, air-lifting,
visual-inspection.
|
August 1995
|
Rockwater A/S
|
Saturation-diver.
MSV Semi II, Statfjord frame-contract. 10 days in saturation, at 146
msv.
Airdiver.
Normand Mjølne, installation of habitat at Veslefrikk
B.
|
July 1995
|
Stolt Comex Seaway A/S
|
Supervisor / airdiver.
Statpipe shore approach, Kalstø. Photo / video / visual - inspection,
core-sampling concrete, concrete casting, burning and welding
|
July 1995
|
Pro dykk A/S
|
Supervisor / airdiver.
Grease-injection in propellers at MS Sira Supporter and MS Vollsøy.
|
July 1995
|
Rogaland Dykkerservice A/S
|
Supervisor / airdiver.
Repair of
sewage-pipeline in Savanger.
New sewage-pipeline, Pull-in and installation at Hunvåg. New sewage-pipeline,
Installation in Kristiansand.
|
June 1995
|
Dolphin Offshore Contractors A/S
|
Airdiver.
Installation of safety-net at Heidrun TLP.
|
Mar. - May. 1995
|
Pro dykk A/S
|
Supervisor / airdiver.
Video-inspection and repairs on USS Whidbey Island, Docking of a ship
at "Klasaskjæret" in Stavanger . Salvage and turnaround-operation of
M/S Unlis in Steinvik
|
March 1995
|
Rogaland Dykkeservice A/S
|
Airdiver.
Building supporter for PH pipeline with growth bags.
|
Jan. - Feb. 1995
|
Pro dykk A/S
|
Supervisor / airdiver.
Inspection at different ships in the Stavanger area.
|
January 1995
|
Dolphin Offshore Contractors A/S
|
Saturation-diver.
At the barge "Buldra". Installation of strainers on water-inlets at
Heidrun TLP. 5 days in saturation. at 70 msv.
|
Nov. - Dec. 1994
|
Pro dykk A/S
|
Supervisor / airdiver.
Propeller inspection on ships, Inspection & repair work on a floating
dock.
|
November 1994
|
Dolphin Offshore Contractors A/S
|
St.by. Saturation-diver.
"Buldra", Installation of navigation equipment
at Heidrun TLP. Deck-handling, welding, cutting etc
|
Oct. - Nov. 1994
|
Rockwater A/S
|
Rigger.
MSV Semi 1/ BB - barge. Blùcher project. Deck-handling of oil separation
tanks, oil pumps etc. Removal of bunker-oil from 2.end wordwar- wreck
in the Oslo-fjord
|
October 1994
|
Rogaland Dykkerservice A/S
|
Airdiver.
Layout of 15" PH pipe. Approx 100m long. Installation of supporter and
filter. Fårevatnet in Time.
|
September 1994
|
Rockwater A/S
|
Rigger.
MSV Semi 2. Statfjord. Welding, cutting, grinding and deck work.
|
Aug. - Sept. 1994
|
Pro dykk A/S
|
Supervisor / airdiver.
Different repair- construction- and Inspection jobs in the Savanger
area.
|
August 1994
|
Stolt Comex Seaway A/S
|
Airdiver.
Seaway Osprey, Inspection at 10 / 1- FP Frigg and NE - Frigg
|
June - July 1994
|
Stolt Comex Seaway A/S
|
Supervisor / airdiver.
Statpipe shore approach Kalstø.
Yearly inspection, repair and maintenance- programme.
|
March - May 1994
|
Pro dykk A/S
|
Supervisor / airdiver.
Different repair- construction- and Inspection-jobs at ships and harbours
in the Stavanger area
|
March 1994
|
Stena Offshore A/S
|
St.by. Saturation-diver.
Stena Seawell. Testing of hydraulic lines at Little Frigg.
|
Nov. 93 - Feb. 1994
|
Pro dykk A/S
|
Airdiver.
Repair- construction- photo / video-inspection jobs in the Stavanger
area.
|
October 1993
|
EB marine A/S
|
Airdiver.
" Buldra ", construction work at Heidrun TLP in the Gandsfjord
|
September 1993
|
Pro dykk A/S
|
Supervisor / airdiver.
Diving support for amplification and piling at Kværner Rosenberg Verft
quay. Inspection of bottom-conditions in a lake, insp. of different
ships etc.
|
August 1993
|
Stolt Comex Seaway A/S
|
Airdiver.
DSV Seaway Osprey, Maintenance-work at Ekkofisk field
|
July 1993
|
DT - diving , J.E.P. - diving & Watertecnique A/S
|
Airdiver.
Minor construction- and inspection-work in Stavanger .
|
May - June 1993
|
Stolt Comex Seaway A/S
|
Airdiver.
MS Risøy, inspection programme of Statpipe shore approach, Kalstø.
|
April 1993
|
Stolt Comex Seaway A/S
|
Airdiver.
QP and TCP - 2 at Frigg, Cleaning, inspection and valve-operations
|
Mars - June 1993
|
Offshore & Marine A/ S
|
Project-engineer.
Developing / designing of decompression-chamber, cost-calculations,
presentation etc
|
Mars 1993
|
EB marine A/S
|
Airdiver.
Minor construction work in Stavanger area.
|
February 1993
|
Dag Trondsen Dykkerservice
|
Supervisor / airdiver.
Dusavik Base, hull- and propeller-inspection of Viking fighter
|
Jan. - Feb. 1993
|
Haaland & Sønn A/S
|
Airdiver & Welder.
Salvage of M/ S Lika in the Stavanger-fjord
|
November 1992
|
Kai Hansen Dykeritjenest Sweden & Alertsen Divecon
|
Operational-manager / Supervisor.
Hjelmeland quay repair- programme, welding / concrete casting.
|
October 1992
|
Comex Norway A / S
|
Airdiver.
Salvage of Borgny Dolphin in the Gandsfjord.
|
Sept. - Oct. 1992
|
Comex Norway A / S
|
Hyperbaric Welder-Diver.
Mersk Guardian sputtcan-repair. Manual welding in habitat at 15msv.
Dusavik Base
|
Aug. - Sept. 1992
|
Stolt Nilsen Seaway A / S
|
Airdiver / Welder / Topside
rigger
DSV Seaway Condor. Pull-in and installation
of 10" riser at TCP - 2 Frigg.
|
May - Aug. 1992
|
Stolt Nilsen Seaway A / S
|
Gasdiver ( Nitrox 32 ) /
Welder & Safety delegate.
MS Mikal 1, Repair programme of Statpipe shore approach, Kalstø.
|
April 1992
|
Stolt Nilsen Seaway A / S
|
Airdiver
Seaway Pelican. Amoco contract. Inspection at N.W - Hutton.
|
Mars - April 1992
|
EB marine A / S
|
Airdiver
Installation of weights over a sewerage-pipeline, Sandnes.
|
Aug. - Des. 1991
|
Stolt Nilsen Seaway A / S
|
Airdiver
Mikal 1 / Seaway Harrier. Repair-programme of Statpipe shore approach,
Kalstø.
|
September 1991
|
EB marine A / S
|
Airdiver
Salvage of MS Astrea in Sand. Inspestion / rigging.
|
July 1991
|
Stolt Nilsen Seaway A / S
|
Airdiver
DSV Seaway Condor. Hydro Contract. Cleaning / inspection at Oseberg
C.
|
July 1991
|
EB marine A / S
|
Airdiver
Norwegian Contractors. Cleaning welds at " Contwin ".
|
May -June 1991
|
Stolt Nilsen Seaway A / S
|
Airdiver
DSV Seaway Harrier. Phillips Contract. Maintenance and construction-work
at Tor, 2 / 4 - G, 2 / 4 - Fl.1 south, 2 / 4 - FTP, 2 / 7 - B, EKO -
D, 2 / 4 - Riser
Airdiver
DSV Seaway Pelican. Statoil Contract. Pull-in and installation of 10"
riser at Statfjord A.
|
May 1991
|
EB marine A / S
|
Airdiver
Norwegian Contractors. Minor construction-work at Sleipner A.
|
April - May 1991
|
Stolt Nilsen Seaway A / S
|
Airdiver & Ass. Life
Support Technician
DSV Seaway Condor. Elf Contract. Inspection / cleaning at QP, DP - 2,
HMP - 1. Frigg / Heimdal.
|
1989 - 1990
|
EB marine A / S
|
Airdiver
Minor Construction-work at Sleipner A in the Gandsfjord. Airdiver at
different quay-installations and ships in Stavanger
|
1987 - 1991
|
Kværner Rosenberg Verft A / S
|
Construction-worker and welder
* Prefabrication, Hall 1.
* Veslefrikk B, Site.
* Veslefrikk A / B, offshore.
* Snorre TLP hull, Dock 1.
* Sleipner A, Gandsfjord.
|
1986 - 1987
|
United Nations, Unifil Lebanon
|
2.nd Squad-leader, Rifleman,
APC commander
Ebel es Saqi, Kaukaba and Ferdis in South Lebanon.
|
1985 - 1986
|
Norwegian Army Defence
|
Squad-leader school, Sessvollmoen.
Squad-leader, H.M. Kings Guard, Røa.
|
1985
|
Sento A / S
|
Handyman, Sandvika / Oslo.
|
1982-1984
|
Thune Eureka A / S
|
Welder-trainee and welder, Lier.
|
1980
|
Oslo Fire brigade no. 09.
|
Handyman / trainee.
|